Browse our metals cost reports
Inform your decision-making using comprehensive analysis of global metals supply and demand, detailed regional market fundamentals and metal price drivers.
Purchase by credit card or invoice
Featured reports
Metals costs reports
Uralsk (P) aluminium smelter
The prebake lines were commissioned in 1994 to eventually replace the Søderberg lines, which came online in 1939. The Søderberg lines closed in 200...
Uralsk (S) aluminium smelter
The Søderberg lines were closed in 2009. Uralsk is now an exclusively prebake technology operation. Wood Mackenzie’s asset reports are built from t...
Uralsk alumina refinery
The Uralsk refinery was commissioned in 1939 together with a smelter of the same name. The refinery had far greater capacity than required by the i...
Shenhuo aluminium smelter
The Shenhuo smelters and Qingyang Qin'ao are costed as a single entity from 2007. Wood Mackenzie’s asset reports are built from the bottom up, inco...
Shenyang zinc smelter
The Shenyang Smelter Corporation was principally a refined lead and copper producer, with a small zinc smelter, capacity 20kt/a, zinc produced from...
Shituru SxEw copper mine
In May 2012 it was reported that the Katangan minister of mines had banned the export of any production from Shituru until further notice following...
Viewing page 338 of 423