Orca and Sul de Orca (formerly Gato do Mato)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- TotalEnergies exits Orca field, increases stake in Lapa in Brazil
- Gato do Mato secures FID
- Technical challenges
- Gas development solution
- Ecopetrol increases its pre-salt presence in Brazil
- History
- Local content
- Reservoir
-
Gas
- Key development metrics
- Facility
- Wells
- Oil
- Gas
- Exploration cost
- Capital costs
-
Operating costs
- Transportation cost
- Oil
- 3 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Reserves (2P) at 01/01/2025Production (2026-2034)
-
Orca Production ProfileSul de Orca Production ProfileCapital Costs 2015 to 2024 (US$ million)Index MapDetail MapParticipationOperating Costs 2028 to 2037 (US$ million)Cash Flow (US$)PV Table (US$)
- 13 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Santa Cruz (LHG) iron ore mine
Santa Cruz is the largest mine of LHG Mining's complex near Corumbá. It offers a high-grade iron ore under a challenging river logistics.
$2,250Pastos Grandes - Lithium brine project
A detailed analysis of the Pastos Grandes lithium brine project.
$2,250Atacama (Albemarle) - Lithium brine
A detailed analysis of the Atacama (Albemarle) lithium brine operation.
$2,250