Moho-Bilondo (Haute Mer Zone D)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Emissions
-
Phase 1E
- Floating Production Unit (FPU)
- Drilling and subsea
- Umbilicals and flowlines
- Pipeline
-
Phase 1Bis
- FPU
- Drilling
- Umbilicals and flowlines
-
Moho Nord
- FPU and TLP
- Drilling
- Subsea systems
- Pipeline
- Future development
- Capital costs
- Operating costs
- Tariff
- Cash flow
- Global Economic Model (GEM) file name
- 1 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Index mapMoho-Bilondo mapParticipation
-
Field characteristicsKey wellsReserves (2P) at 01/01/2026Production (2015-2024)Production profileCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2024 to 2033 (US$ million)Profit oil splitCash Flow (US$)
- 6 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Bougouni - Lithium mine project
A detailed analysis of the Bougouni lithium mineral project.
$2,250Utica Quebec shale gas unconventional play
A detailed analysis of the Utica Quebec shale gas unconventional play.
$2,800Block 31 (Apaika)
Block 31 (Apaika) is located in the prolific Oriente basin, westwards of the heavy oil producer Block 43 (ITT). The majority of the ...
$3,100